Forging and Press Production

Forging mills
Forging and press mills

Reheating furnace

The project of replacing the failed sections of the tube recuperator with all connecting dimensions kept (“disassembly-assembly” option) as part of the investment program.

Result
During operation all the performance parameters, the declared efficiency and payback period have been achieved.

OPERATIONAL PARAMETERS:

HOT SIDE

COLD SIDE

Inlet temperature, °С
1 000
15

Outlet temperature, °С
700
400

Flow rate, Nm3 / h
4 000
3 750

Pressure drop in channels, mm. WG
13
46

Thermal power, kW
535

Thermal efficiency, %
39,1