Heating of industrial premises
Workshop of basalt wool production. Afterburner and gas cleaning system of cupola gases.
Heating of industrial premises at the expense of heat utilization of flue gases. Installation of the heat exchanger for preheating the outside air in the cupola afterburner system after gas cleaning.
Project of heat utilization system implementation.
Year of implementation
2015
Scope of supply
Recuperator manufacturing and delivery.
Result
operation all the performance parameters have been achieved.
PERFORMANCE PARAMETERS:
HOT SIDE
COLD SIDE
Inlet temperature, °С
200
-20
Outlet temperature, °С
174
10
Flow rate, Nm3 / h
17 000
5 000
Pressure drop in channels, mm. WG
24
49
Thermal power, kW
170
Combustion air preheating of melt basalt furnace
Workshop production of basalt fiber. Furnaces melting of basalt ore.
Construction of a new plant in China.
Result
During operation all the performance parameters have been achieved.
PERFORMANCE PARAMETERS :
HOT SIDE
COLD SIDE
Inlet temperature, °С
1 100
20
Outlet temperature, °С
718
650
Flow rate, Nm3 / h
600
540
Pressure drop in channels, mm. WG
5
45
Thermal power, kW
133