Blast furnaces
Blast shop.
Air preheaters (cowper stoves)
The project of the heat recovery system of flue gases after cowper stoves for heating water in utility buildings.
Approved in the framework of the investment program for 2018-2020 .
OPERATIONAL PARAMETERS:
HOT SIDE
COLD SIDE
Inlet temperature, °С
205
50
Outlet temperature, °С
72
100
Flow rate, Nm3 / h
120 000
100
Pressure drop in channels, mm. WG
21
2047
Thermal power, kW
6 027