Shale mining and processing

Oil shale mining and processing.
Natural stone processing facility. Drum dryer.

Replacement of the failed recuperator with hot air supplied for premises heating

Approved for implementation.

PERFORMANCE PARAMETERS:

HOT SIDE

COLD SIDE

Inlet temperature, °С
180
-10

Outlet temperature, °С
117
60

Flow rate, Nm3 / h
4 500
4 500

Pressure drop in channels, mm. WG
19
106

Thermal power, kW
114