Mine heating systems
The mine shaft heating systems.
Air heating system.
The heating system modernization program. Replacing of inefficient tubular air heaters.
3 stages of implementation
2015, 2016 and 2017.
Scope of delivery
Recuperator manufacturing, delivery, installation supervision and commissioning.
Result
During operation all the performance parameters, the declared efficiency and payback period have been achieved.
PERFORMANCE PARAMETERS:
HOT SIDE
COLD SIDE
Inlet temperature, °С
500
-40
Outlet temperature, °С
266
300
Flow rate, Nm3 / h
78 000
60 200
Pressure drop in channels, mm. WG
68
102
Thermal power, kW
7 364
Degree of heat recovery, %
63,0