Modernization of boiler plants mining and processing plant

Mine heating systems
The mine shaft heating systems.

Air heating system.

The heating system modernization program. Replacing of inefficient tubular air heaters.

3 stages of implementation
2015, 2016 and 2017.

Scope of delivery
Recuperator manufacturing, delivery, installation supervision and commissioning.

Result
During operation all the performance parameters, the declared efficiency and payback period have been achieved.

PERFORMANCE PARAMETERS:

HOT SIDE

COLD SIDE

Inlet temperature, °С
500
-40

Outlet temperature, °С
266
300

Flow rate, Nm3 / h
78 000
60 200

Pressure drop in channels, mm. WG
68
102

Thermal power, kW
7 364

Degree of heat recovery, %
63,0