Recuperators for mining industry

Mine heating systems
The mine shaft heating systems.

Air heating system.

The heating system modernization program. Replacing of inefficient tubular air heaters.

3 stages of implementation
2015, 2016 and 2017.

Scope of delivery
Recuperator manufacturing, delivery, installation supervision and commissioning.

Result
During operation all the performance parameters, the declared efficiency and payback period have been achieved.

PERFORMANCE PARAMETERS:

HOT SIDE

COLD SIDE

Inlet temperature, °С
500
-40

Outlet temperature, °С
266
300

Flow rate, Nm3 / h
78 000
60 200

Pressure drop in channels, mm. WG
68
102

Thermal power, kW
7 364

Degree of heat recovery, %
63,0

Heat exchanger for water heating in a wood chip boiler.
Heat exchanger for water heating in a wood chip boiler.

Wood chip boiler.

Implementation of a water heating system for the ore enrichment plant.

Year of implementation
2017

Scope of delivery
Recuperator manufacturing and delivery

Result
During operation all the performance parameters, the declared efficiency and payback period have been achieved.

PERFORMANCE PARAMETERS:

HOT SIDE

COLD SIDE

Inlet temperature, °С
240
15

Outlet temperature, °С
137
55

Flow rate, Nm3 / h
4 400
10

Pressure drop in channels, mm. WG
6

Thermal power, kW
176

Oil shale mining and processing.
Natural stone processing facility. Drum dryer.

Replacement of the failed recuperator with hot air supplied for premises heating

Approved for implementation.

PERFORMANCE PARAMETERS:

HOT SIDE

COLD SIDE

Inlet temperature, °С
180
-10

Outlet temperature, °С
117
60

Flow rate, Nm3 / h
4 500
4 500

Pressure drop in channels, mm. WG
19
106

Thermal power, kW
114