Combustion air preheating of melt basalt furnace
Workshop production of basalt fiber. Furnaces melting of basalt ore.
Construction of a new plant in China.
Result
During operation all the performance parameters have been achieved.
PERFORMANCE PARAMETERS :
HOT SIDE
COLD SIDE
Inlet temperature, °С
1 100
20
Outlet temperature, °С
718
650
Flow rate, Nm3 / h
600
540
Pressure drop in channels, mm. WG
5
45
Thermal power, kW
133