Forging production
Forging production
High speed billet heating
Year of implementation:
2015
Scope of supply
Recuperator manufacturing, delivery, installation supervision and commissioning.
Result
During operation all the performance parameters have been achieved.
PERFORMANCE PARAMETERS:
HOT SIDE
COLD SIDE
Inlet temperature, °С
1 050
15
Outlet temperature, °С
750
420
Flow rate, Nm3 / h
1 160
1 055
Pressure drop in channels, mm. WG
5
122
Heat treatment
Heat treatment furnace.
Construction of a new furnace as part of an integrated production modernization programs.
Year of implementation
2013
Scope of supply
Recuperator manufacturing, delivery, installation supervision and commissioning.
Result
During operation all the performance parameters have been achieved.
PERFORMANCE PARAMETERS:
HOT SIDE
COLD SIDE
Inlet temperature, °С
850
20
Outlet temperature, °С
606
356
Flow rate, Nm3 / h
4 200
3 600
Pressure drop in channels, mm. WG
18
52
Thermal power, kW
446
Thermal efficiency, %
40,4
Foundry
Foundry complex of a car factory.
The reverberatory aluminum melting furnace.
Implementation of recuperators for preheating combustion air supplied to the burners.
Approved in the framework of the investment program of the holding.
PERFORMANCE PARAMETERS:
HOT SIDE
COLD SIDE
Inlet temperature, °С
850
0
Outlet temperature, °С
658
250
Flow rate, Nm3 / h
9 000
8 300
Pressure drop in channels, mm. WG
3
104
Thermal power, kW
757
Thermal efficiency, %
29,4
Painting line
Painting line of a defense enterprise.
The painting chamber.
Implementation of the recuperator for air preheating of ventilation system.
Result
During operation all the performance parameters have been achieved.
PERFORMANCE PARAMETERS:
HOT SIDE
COLD SIDE
Inlet temperature, °С
60
-20
Outlet temperature, °С
12
20
Flow rate, Nm3 / h
2 500
2 500
Pressure drop in channels, mm. WG
80
65
Thermal power, kW
76
Thermal efficiency, %
70,1