SDPP
P-59 boilers.
The project of replacing the failed sections of the tube recuperator with all connecting dimensions kept.
Approved for implementation.
PERFORMANCE PARAMETERS:
HOT SIDE
COLD SIDE
Inlet temperature, °С
310
15
Outlet temperature, °С
160
240
Flow rate, Nm3 / h
825 000
585 000
Pressure drop in channels, mm. WG
92
160
Thermal power, kW
48 114
Boiler room.
District heating boiler. Boilers DKVr. Fuel — fuel oil.
Heated primary air for the DKVr-6.5 / 13 boiler
operating on fuel oil in water mode for district heating.
operating on fuel oil in water mode for district heating.
Result
During operation all the performance parameters, the declared efficiency and payback period have been achieved.
PERFORMANCE PARAMETERS:
HOT SIDE
COLD SIDE
Inlet temperature, °С
270
-18
Outlet temperature, °С
188
70
Flow rate, Nm3 / h
13 620
13 620
Pressure drop in channels, mm. WG
32
73
Thermal power, kW
429
Gas turbine power plant
Heat recovery system (HRS) gas turbine power plant.
Recuperator for gas turbine power plant
Result
During operation extra efficiency have been achieved
PERFORMANCE PARAMETERS:
HOT SIDE
COLD SIDE
Inlet temperature, °С
190
20
Outlet temperature, °С
90
95
Flow rate, Nm3 / h
19 400
32
Pressure drop in channels, mm. WG
34
Thermal power, kW
733
Gas turbine unit BKGPEA-200.
Heat recovery system (HRS) gas turbine unit.
Recuperator of gas turbine unit used for premises heating
Result
During operation extra efficiency have been achieved
ЭPERFORMANCE PARAMETERS:
HOT SIDE
COLD SIDE
Inlet temperature, °С
550
-20
Outlet temperature, °С
160
40
Flow rate, Nm3 / h
800
5 700
Pressure drop in channels, mm. WG
14
44
Thermal power, kW
122