Tower for heating gasoline before distillation

Fuel reheating before distillation
Fuel reheating unit before distillation

Tubular furnace P-1 and P-2.

The project of replacing the failed tube recuperator.

Year of implementation
2015

Scope of supply
Recuperator manufacturing and delivery.

Result
During operation all the performance parameters have been achieved.

Payback period
Confirmed.

PERFORMANCE PARAMETERS:

HOT SIDE

COLD SIDE

Inlet temperature, °С
700
-25

Outlet temperature, °С
528
220

Flow rate, Nm3 / h
30 000
27 300

Pressure drop in channels, mm. WG
5
60

Thermal power, kW
2 473